Factoria Blvd Stormwater Improvements Project Online Open House

Share Factoria Blvd Stormwater Improvements Project Online Open House on Facebook Share Factoria Blvd Stormwater Improvements Project Online Open House on Twitter Share Factoria Blvd Stormwater Improvements Project Online Open House on Linkedin Email Factoria Blvd Stormwater Improvements Project Online Open House link

Thank you for your interest in this project. At this time, the Online Open House has concluded. If you have any additional questions or comments, please contact Birol Shaha, bshaha@bellevuewa.gov or 425-452-4477.

What is the project?

Bellevue Utilities is pursuing a project to improve the stormwater system along Factoria Blvd to reduce the risks of street flooding during heavy storm events.

Construction will be located along Factoria Blvd between SE 38th Street and SE 36th Street (see map at right). The project is currently in planning phase, with construction projected to start in Spring 2022.

Thank you for your interest in this project. At this time, the Online Open House has concluded. If you have any additional questions or comments, please contact Birol Shaha, bshaha@bellevuewa.gov or 425-452-4477.

What is the project?

Bellevue Utilities is pursuing a project to improve the stormwater system along Factoria Blvd to reduce the risks of street flooding during heavy storm events.

Construction will be located along Factoria Blvd between SE 38th Street and SE 36th Street (see map at right). The project is currently in planning phase, with construction projected to start in Spring 2022.

  • About the project

    Share About the project on Facebook Share About the project on Twitter Share About the project on Linkedin Email About the project link

    The Factoria Boulevard Stormwater Conveyance Improvements project will improve stormwater infrastructure to reduce the risks of flooding during heavy storms in the Factoria-Richards Creek drainage basin.

    The city will replace a segment of stormwater pipe with a larger one along the northbound lanes of Factoria Boulevard Southeast, next to the Factoria Village commercial area. The city will also install a concrete box to hold stormwater, which will drain into a modified Richards Creek Inlet channel.

    Please view the other articles in this section for key details about this project.

  • Why is this construction needed?

    Share Why is this construction needed? on Facebook Share Why is this construction needed? on Twitter Share Why is this construction needed? on Linkedin Email Why is this construction needed? link

    Flooding is a recurrent event in the Factoria-Richards Creek drainage basin during major storms. In August 2014, a heavy storm inundated Factoria Boulevard with nearly 4 feet of water. Businesses were flooded, streets were impassible and the community was significantly disrupted.

    These kinds of storms have increased in frequency in the last decade and may continue to increase as a result of climate change. If the city does not expand and improve the capacity of the existing storm drainage system, more flooding events on Factoria Boulevard may occur, causing significant disruption to traffic flow in the region and economic impacts to the many businesses in this area.

    The city is committed to improving the stormwater system to make sure another large flooding event does not disrupt the area again.

  • Where is the project located?

    Share Where is the project located? on Facebook Share Where is the project located? on Twitter Share Where is the project located? on Linkedin Email Where is the project located? link

    The project is located along Factoria Boulevard between Southeast 38th and 36th streets, south of Interstate-90. Project work will also include a portion of Richards Creek, along the east side of Factoria Boulevard and south of Southeast 36th Street.


  • Project timeline

    Share Project timeline on Facebook Share Project timeline on Twitter Share Project timeline on Linkedin Email Project timeline link

  • What to expect during construction?

    Share What to expect during construction? on Facebook Share What to expect during construction? on Twitter Share What to expect during construction? on Linkedin Email What to expect during construction? link

    The city recognizes that project construction will affect those who live, work, and travel through the area. We are working to minimize disruption to the extent possible, including the measures outlined below.


    The cross-section above shows what the project zone along Factoria Blvd SE may look like during construction.

    Business access: Access to the businesses on both sides of Factoria Boulevard will be maintained throughout project construction. The city will provide clear signage to highlight business access locations.

    Traffic impacts:

    • The City will not fully close Factoria Boulevard for an extended period.
    • Both northbound Factoria Boulevard lanes will be closed, and one of the current southbound lanes will become a northbound lane.
    • There will be changes to normal traffic patterns and times. The City will share the results of a Traffic Impact Analysis soon that will have more detail on specific impacts and mitigation measures.

    Pedestrian and bicycle access: The sidewalk on the east side of the road will be closed, but the sidewalk on the west side will remain open, along with safe and accessible detours.

    Bus routes: The two King County Metro bus stops in the project area will be temporarily relocated. The City will coordinate with King County Metro to minimize impacts to transit service and determine the new temporary bus stop locations.

    As the project nears construction, the city will share more detailed information about these impact areas to support businesses and residents and to help commuters plan travel routes.

  • How to stay in touch and share input?

    Share How to stay in touch and share input? on Facebook Share How to stay in touch and share input? on Twitter Share How to stay in touch and share input? on Linkedin Email How to stay in touch and share input? link


    The city is working to engage with residents, businesses and commuters who may be impacted by this project on multiple channels, including this project website, mailed notices, one-on-one meetings and online open houses.

    In addition to sharing the project purpose, benefits and potential construction impacts, we want to understand and support the needs of the community to the extent possible.

    City teams continue to communicate individually with impacted residents and businesses. Later this year, the city will host an upcoming Online Open House to share project information with the neighborhood.


Page last updated: 24 Mar 2022, 04:01 PM